Monday, March 25, 2019

Layout Tour: Elevator Ride

This video shows #24 with freight train backing out of the siding at Strong and headed up to Bigelow.

The elevator transfers trains the 24" between the lower and upper levels and will hold up to a 12 car train.  

The track is protected by several photo cells that will keep the elevator from moving if any rolling stock is not clear of the transition zone.



No comments:

Post a Comment